For a tram network in Malaysia, Europoly has developed a reinforced, three-sided open polyester enclosure for tram disconnectors, with a structure designed to withstand heavy loads.

Tram and metro track isolator

The solution developed by Europoly

Malaysia

Issues, project and solutions

Background

A highly constrained railway environment

Europoly was commissioned by an international company specialising in the installation of disconnectors and switches for trams and underground railways to design a reinforced polyester enclosure for a railway application in Malaysia. The enclosure had to blend into the railway environment whilst meeting requirements regarding accessibility, mechanical rigidity and weight.

Need

A large-sized isolator for installation

The client required a polyester enclosure for a tramway disconnector, capable of housing a large disconnector whilst providing full access for installation, inspection and maintenance. The project required access from three sides via five doors, the addition of a side polyester enclosure, a reinforced four-pitched roof and a structure designed to support heavy loads without adding unnecessary weight to the assembly, whilst remaining suitable for export and mass production.

constraint

Tram and metro track isolator

The polyester enclosure for the tramway disconnector was required to accommodate a large disconnector for a tram network, provide full accessibility and ensure high mechanical strength, whilst remaining suitable for mass production for an international client.

Solution

The solution developed by Europoly

Europoly’s export sales team and design office analysed the client’s specifications and then designed a polyester enclosure for a tramway disconnector, using tooling and moulds manufactured in-house. The solution features access from three sides via five doors, a reinforced four-sloped roof and a side polyester enclosure, whilst reinforcing the overall structure without increasing the total weight.

Technical points

Technical aspects of the project

  • Material: fibreglass-reinforced polyester, reinforced cabinet.
  • End use: installation of a very large tram/underground track disconnector.
  • Design: open on three sides, with five doors.
  • Roof: reinforced four-pitched roof.
  • Installation: polyester enclosure fitted to one side of the cabinet.
  • Structure: reinforced for heavy loads without increasing the overall weight.
  • Project stages: review of the specifications, CAD design of the tooling, production of the moulds and mass production.

benefits

This project has made the following possible:

Liste des bénéfices

the images of the project

Armoire, coffret et cabine polyester europoly

What is the benchmark for your on-site constraints?

Enclosures, cabinets or control booths – discover the Europoly Group’s product ranges!

Some other achievements...